3-ton air conditioner and pairing it with a 100,000 BTU furnace


Purchasing a 3-ton air conditioner and pairing it with a 100,000 BTU furnace is a major upgrade that brings improved comfort, energy savings, and home value. But installation is more than just a plug-and-play job—it involves precise planning, compliance with modern standards, and coordination with certified HVAC professionals.

This guide breaks down what homeowners can expect during the installation of a 3-ton AC and 100,000 BTU furnace bundle, especially systems using R-32 A2L refrigerant.


🛠️ Site Assessment and Load Calculation

What Happens:

  • HVAC technicians will conduct a Manual J load calculation to ensure your home’s size, layout, insulation, and orientation are factored in.

  • They'll inspect existing ductwork for airflow and pressure compatibility.

📘 Reference: Energy.gov’s HVAC sizing guidelines

Goal: Confirm that a 3-ton AC and 100,000 BTU furnace is the right match for your home.


📦 Delivery and Staging

Expect delivery of:

  • Outdoor condenser (e.g., Goodman GLXS4BA3610)

  • Indoor air handler or coil

  • Furnace unit (e.g., Goodman GM9S961005CN)

  • Thermostat (if upgrading)

  • Refrigerant line set and electrical materials

Prep Work:

  • Clear access to indoor and outdoor install areas

  • Ensure adequate ventilation for A2L refrigerant compliance

Tip: If using R-32, make sure components are labeled and certified for A2L refrigerants.


🔧 Installation Process (Day-by-Day)

Day 1: Removal and Prep

  • Disconnect old HVAC system (if applicable)

  • Prepare slab for outdoor unit

  • Cut and mount new supply/return plenums

Day 2: New System Installation

  • Set furnace and air handler

  • Route and connect new refrigerant lines

  • Install A2L-compliant safety components (e.g., leak sensors, labels)

📘 See EPA guidelines on safe refrigerant handling

Day 3: Electrical, Testing, and Commissioning

  • Install new thermostat and low-voltage control wiring

  • Charge system with R-32 refrigerant

  • Perform airflow and refrigerant pressure checks

  • Calibrate system for optimal SEER2 performance


✅ Safety and Code Compliance

With A2L refrigerants like R-32, special attention is required:

  • Pressure relief venting to outdoor areas

  • Refrigerant leak detectors in enclosed mechanical rooms

  • Proper labeling of all A2L system components

Tip: Ensure your contractor is trained in A2L installation and carries up-to-date certifications.

📘 More on A2L safety from Daikin


💵 Total Installation Cost Breakdown (2025)

Component Cost Range
3-Ton AC Unit (R-32) $2,200–$3,200
100,000 BTU Furnace (96% AFUE) $1,600–$2,400
Labor and Permitting $2,000–$3,500
A2L Safety Accessories $300–$600
Thermostat + Accessories $150–$400
Total Estimate $6,500–$9,800

📘 Get local rebates for energy-efficient HVAC at DSIRE


📑 Final Inspection and Warranty Registration

Once installation is complete:

  • Local building inspector may review electrical and refrigerant connections

  • Homeowner should receive:

    • AHRI certificate

    • Manufacturer warranty registration (often required within 60 days)

📘 Verify your system in the AHRI Directory


🏁 Final Takeaway: Preparation Leads to Performance

Installing a 3-ton AC and 100,000 BTU furnace is a major investment in home comfort. When done correctly—with attention to SEER2 compliance, A2L safety, and airflow optimization—it provides powerful, efficient performance for years.

Explore future-ready combinations like the Goodman 3 Ton R-32 Bundle and work with an A2L-certified contractor to ensure full compliance and maximum savings.

Air conditioningBuyer's guidesFurnacesHvac 101Industry news

Leave a comment

All comments are moderated before being published